Previous | Home | Next

After the wood was sanded smooth, all edges except those where the Ebony Star Formica would be installed were rounded over to eliminate sharp edges. Then the altitude bearings were sealed using the same 50-50 varnish/paint thinner mixture. 1/4-20 bolts were placed in the T-nuts to support the wood while the sealer dried.